Why:NPG FQC is the final inspection after outsourced overmolding returns — tracked by lot number, not production date, because that leg ships and returns as a whole batch.
Select a lot (only lots with quantity left to judge are listed); the return date fills in automatically.
Enter PASS and FAIL-by-defect quantities.
The total can't exceed that lot's available amount.
Enter the operator ID and submit.
If Overmolding hasn't returned yet but parts already arrived here, use Manual Add — no cap.
NPG FQC — Judgment by Return Date (Lot)
Return date:2026-07-11 · Lot OM26071101
Available to judge (OM return out, not yet judged here):5 pcs
Made a mistake? Quick report
Manual inspection entry
For when material has returned but the ship lot is not yet on file, or OM return has not checked out. You may fill in just theReturn date, leaving the lot blank (to fill in later). This sectionavailable qty not checked.